The landed cost of open access power: what you really pay
How the delivered cost of open access renewable power builds up — generator tariff, network charges, surcharges, losses, banking — and how to compare it.
By ANR Horizon Editorial Team · · 4 min read

An open access developer may quote an attractive tariff for renewable power. But that tariff is what the generator receives at its plant — not what the consumer pays for power delivered to its factory. The landed cost includes everything between the plant and the factory meter. Comparing landed cost with your grid tariff is the only fair way to judge whether open access saves money.
The building blocks
1. Generator tariff
The price paid to the generator under the PPA, at the plant or delivery point. See what is a PPA.
2. Transmission charges
For using the transmission network to carry power from the plant towards the consumer.
3. Wheeling charges
For using the distribution network to deliver power to the consumer.
4. Network losses
Some energy is lost in transmission and distribution. The consumer receives less energy than the plant injects, so the effective cost per unit received rises.
5. Cross-subsidy surcharge
A charge compensating the distribution company for loss of cross-subsidy when consumers source power elsewhere. Whether it applies depends on the arrangement and current rules.
6. Additional surcharge
A charge that may apply to compensate the distribution company for stranded costs, depending on current rules.
7. Banking charges
If surplus energy is banked for later use, banking charges may apply. See energy banking explained.
8. Scheduling and deviation charges
Charges related to forecasting and scheduling, and to deviations from schedule, where applicable.
9. Other charges
Application fees, metering costs, SLDC charges and other administrative costs.
Putting it together
| Component | Effect on cost |
|---|---|
| Generator tariff | Base |
| Transmission | Adds |
| Wheeling | Adds |
| Losses | Increases effective cost per unit received |
| Cross-subsidy surcharge | Adds, if applicable |
| Additional surcharge | Adds, if applicable |
| Banking | Adds cost on banked units |
| Scheduling/deviation | Adds, variable |
| Admin | Small, fixed |
Landed cost per unit = (all costs) ÷ (units actually received and used)
Comparing with the grid
The benchmark is the tariff you would otherwise pay to the distribution company for those units — specifically the energy charge, not fixed demand charges that continue regardless. See reading your industrial electricity bill.
Savings per unit = grid energy rate − landed cost
Why charges vary
Charges depend on:
- Voltage level of connection
- Location of plant and consumer
- Type of arrangement — third-party, captive, group captive
- Source — renewable or conventional
- Current regulations — national rules and state orders
Captive and group captive
Captive arrangements meeting applicable conditions have historically been exempt from cross-subsidy surcharge and additional surcharge. This can significantly lower landed cost — but only if captive conditions are met. See open access vs group captive.
Green energy open access
National rules on green energy open access introduced provisions intended to support renewable open access, including on surcharges and banking. State implementation varies. See green energy open access explained.
Testing scenarios
Because charges are set by regulators and change, test the landed cost under different scenarios:
- Base case — current charges
- Higher charges — increases in surcharges or network charges
- Banking changes — tighter banking rules
- Grid tariff changes — your benchmark tariff rising or falling
A project that saves money only under today's charges carries more risk than one that saves money across scenarios.
Change in law
How the PPA allocates changes in regulatory charges matters. If the consumer bears all changes, it carries regulatory risk. If shared or capped, risk is reduced.
Seasonal effects
Solar and wind generation vary by season, and so does the energy available to consume. Combined with banking rules, this affects how many units are actually used versus banked, lapsed or sold at lower value. Model landed cost month by month.
An illustrative structure
The figures below are illustrative only, to show the method:
- Start with the generator tariff per unit at the plant
- Add transmission and wheeling charges per unit
- Adjust for losses (divide by the share of energy that arrives)
- Add any applicable surcharges per unit
- Add banking charges on the share of units banked
- Add scheduling and admin costs spread over annual units
- Compare the result with the grid energy rate
Common mistakes
- Comparing generator tariff directly with grid tariff
- Forgetting losses
- Using the average bill rate as the benchmark
- Assuming surcharge exemptions apply without checking conditions
- Not testing against regulatory changes
How we help
Through open access and group captive solar work with industrial consumers, we help build landed cost comparisons, test scenarios and coordinate off-site project development. Regulatory interpretation should be confirmed with the regulator, utilities and qualified advisers.
Frequently asked questions
Have a project or land in mind?
Talk to ANR Horizon Group about land, solar, wind or industrial projects — wherever you sit in the process.
More on industrial energy

Industrial Energy
Battery storage for industrial sites: an introduction
What battery storage can do for factories — peak shaving, solar shifting, backup and power quality — the main technologies, costs and the questions to ask.
14 October 2026 · 4 min read

Industrial Energy
CAPEX vs OPEX solar: which model suits your factory?
How owning a solar system (CAPEX) compares with buying its power from a developer (OPEX/RESCO) — cost, risk, control, maintenance and contract terms.
14 October 2026 · 4 min read

Industrial Energy
Energy banking explained: storing renewable credits in the grid
How energy banking lets surplus renewable generation be credited and used later, the rules and charges involved, and how banking terms change value.
14 October 2026 · 4 min read