Skip to content
ANR Horizon

Solutions

For Industrial Consumers

Whether you have roof or ground space for on-site solar, or need to procure power from an off-site project through open access or group captive arrangements, moving to solar-sourced power starts with understanding which structure fits your facility.

We assess your site and consumption profile and coordinate the right path, working with qualified EPC partners for installation and with generation projects for off-site power.

Aerial view of a large industrial facility and its surrounding plots

Start from your electricity bill

The right solar route depends on how much power you use, when you use it, your connection category and tariff, and how much roof or land you have. We start from your actual bills rather than generic savings estimates.

From there, we compare on-site rooftop or ground-mount solar with open access and group captive options, including the charges each route carries under current state rules.

Keeping it simple for your team

Most facilities do not have staff dedicated to energy procurement. We coordinate the EPC partner or the generating project, the documentation and the regulatory steps, and keep your team informed without making it their full-time job.

What We Do Directly

  • Assess your facility's consumption, site area and technical suitability
  • Recommend the right structure — on-site rooftop/ground-mount, open access or group captive
  • Coordinate EPC partners for on-site installation, or generation projects for off-site supply
  • Guide you through the regulatory and documentation steps involved

Delivered Through Qualified Partners

  • Installation of rooftop or ground-mount systems
  • Generation of power at off-site projects (for open access or group captive)
  • Ongoing O&M once a system is commissioned

Process

  1. 01Review your current consumption, tariff and available site area
  2. 02Assess suitability for on-site solar vs. open access / group captive
  3. 03Recommend a structure and indicative approach
  4. 04Coordinate the relevant partners and documentation
  5. 05Track through to commissioning or supply start

Documents & Inputs Needed

  • Recent electricity bills showing consumption and tariff
  • Site layout or roof plan, if considering on-site solar
  • Current sanctioned load and connection details

Frequently Asked Questions