What is a PPA? How power purchase agreements are structured
A plain guide to power purchase agreements for renewable energy — parties, tariff, term, volumes, shortfalls, change in law, termination and risk sharing.
By ANR Horizon Editorial Team · · 4 min read

When an industrial consumer buys renewable power from a generator — whether from a rooftop system it doesn't own or from an off-site solar farm — the arrangement is usually set out in a power purchase agreement (PPA). A PPA is a long-term commercial contract that defines what power will be supplied, at what price, for how long, and what happens when things go wrong.
The parties
- Seller — the generator or project company that owns the plant
- Buyer — the consumer, or in utility-scale projects, a distribution company or intermediary
- Sometimes lenders, who may have rights under direct agreements
Common PPA settings
| Setting | Seller | Buyer |
|---|---|---|
| On-site rooftop (OPEX/RESCO) | Developer owning the rooftop system | Building owner |
| Off-site open access | Independent generator | Industrial consumer |
| Utility-scale | Project developer | Distribution company or intermediary |
See CAPEX vs OPEX solar for factories and open access vs group captive.
Key terms
Term
How long the PPA lasts. Renewable PPAs commonly run for many years to give the generator revenue certainty for financing.
Tariff
The price per unit of electricity. Structures include:
- Fixed tariff — the same price throughout
- Escalating tariff — increasing at a set rate
- Discount to grid tariff — linked to the consumer's utility tariff
Volume
- Take-or-pay — buyer pays for contracted energy whether or not it uses it
- Take-and-pay — buyer pays only for energy delivered and taken
- Contracted capacity — maximum the seller will supply
Delivery point
Where energy is delivered and measured — the plant, a grid substation, or the consumer's premises. Losses and charges before or after this point affect cost.
Generation guarantee or shortfall
What happens if the plant generates less than expected — compensation for shortfall, or no obligation. Buyers should understand who bears weather risk and plant performance risk.
Payment terms
When invoices are issued, when payment is due, and late payment consequences.
Payment security
Generators often ask for security — a letter of credit, bank guarantee or deposit — to protect against non-payment.
Change in law
If laws, regulations or charges change, who bears the cost? This is a crucial risk allocation clause, especially for open access where charges are set by regulation.
Force majeure
Events outside either party's control — natural disasters, certain government actions — and how obligations are suspended or terminated.
Termination
Events allowing termination — such as payment default, insolvency or prolonged non-supply — and termination payments.
Transfer
Whether either party can transfer the PPA — for example, if the plant is sold, or the consumer's facility is sold or relocated.
Risk allocation
A PPA is fundamentally about who bears which risk:
| Risk | Typically borne by |
|---|---|
| Construction delay | Seller, often with damages |
| Plant performance | Seller, within guarantee terms |
| Weather/resource | Often buyer under take-and-pay; negotiable |
| Regulatory charges | Depends on change-in-law clause |
| Buyer's consumption falling | Buyer, especially under take-or-pay |
| Buyer's credit | Seller, mitigated by payment security |
For industrial buyers
Before signing:
- Model landed cost over the term, not just year one. See landed cost of open access power.
- Check that volumes match your expected consumption
- Understand change-in-law exposure
- Check exit options if your facility changes
- Confirm the PPA supports your sustainability reporting. See renewable power and sustainability reporting.
For generators
Lenders will scrutinise:
- Buyer creditworthiness
- Payment security
- Termination payments
- Change-in-law protection
PPAs and regulation
Off-site PPAs operate within open access regulations, which define charges, scheduling and banking. A PPA cannot override regulations, so terms must be consistent with current rules. Check with the state regulator and distribution company.
Questions to ask
- What exactly is the tariff, and how does it change?
- What volume am I committing to?
- What happens if generation falls short?
- Who bears changes in regulatory charges?
- What security must I provide?
- How can I exit, and at what cost?
Common mistakes
- Focusing only on the headline tariff
- Accepting take-or-pay volumes above expected consumption
- Ignoring change-in-law clauses
- Not planning for facility relocation or sale
- Signing without legal review
Reviewing a PPA over its life
A PPA is not "sign and forget". Over a long term, consumption changes, regulations change and plant performance changes. Review delivered energy, invoices and charges against the contract at least annually, and keep a log of any regulatory changes that might trigger change-in-law provisions. Disputes are far easier to resolve when both sides have kept clear records.
How we help
Through open access and group captive and C&I solar work, we help industrial consumers understand PPA structures, compare options and coordinate with developers. Legal review should come from qualified lawyers.
Frequently asked questions
Have a project or land in mind?
Talk to ANR Horizon Group about land, solar, wind or industrial projects — wherever you sit in the process.
More on industrial energy

Industrial Energy
Battery storage for industrial sites: an introduction
What battery storage can do for factories — peak shaving, solar shifting, backup and power quality — the main technologies, costs and the questions to ask.
14 October 2026 · 4 min read

Industrial Energy
CAPEX vs OPEX solar: which model suits your factory?
How owning a solar system (CAPEX) compares with buying its power from a developer (OPEX/RESCO) — cost, risk, control, maintenance and contract terms.
14 October 2026 · 4 min read

Industrial Energy
Energy banking explained: storing renewable credits in the grid
How energy banking lets surplus renewable generation be credited and used later, the rules and charges involved, and how banking terms change value.
14 October 2026 · 4 min read