Location vs price: the real trade-off for logistics land

Why cheaper logistics land further out can cost more over time — transport, time, workforce and service levels — and how to compare sites on total cost.

By ANR Horizon Editorial Team · · 4 min read

Warehouse aisle lined with pallet racking and stacked cartons

When comparing sites for a warehouse or distribution centre, the land price is the easiest number to see. It's large, it comes first, and it's clearly different from site to site. But over the life of a logistics facility, land is often a modest part of total cost. Transport, labour and service levels — all driven by location — usually matter more. Choosing on land price alone is one of the most common mistakes in logistics real estate.

The trade-off

Closer, more expensive land

  • Shorter, faster trips to customers
  • Better service levels — same-day or next-day delivery
  • Easier staff recruitment from nearby residential areas
  • Higher land cost or rent
  • Possibly smaller, constrained plots

Further, cheaper land

  • Lower land cost or rent
  • Larger plots and room to expand
  • Longer trips and higher transport cost
  • Slower delivery to customers
  • Harder staff commuting

What to include in a comparison

1. Land and building cost

Purchase price or rent, development cost, stamp duty, taxes and charges.

2. Transport cost

  • Outbound trips to customers or stores
  • Inbound trips from suppliers, ports or factories
  • Distance, time, fuel, tolls and vehicle costs
  • Congestion effects at peak times

3. Time and service levels

  • Delivery times to customers
  • Ability to meet promised service windows
  • Number of vehicles needed to serve the same customers (longer trips need more vehicles)

4. Workforce

  • Availability of workers nearby
  • Commuting time and transport provision
  • Wage levels and retention

5. Utilities

Power, water and telecom quality and cost. See power and water availability.

6. Risk

7. Flexibility

Room to expand, and ability to adapt the facility as the business changes.

A simple illustrative comparison

The structure below is illustrative; it shows the method, not real figures.

Cost elementSite A (closer)Site B (further)
Annual land cost or rentHigherLower
Annual outbound transportLowerHigher
Annual inbound transportSimilarSimilar
Vehicles requiredFewerMore
Staff transportLowerHigher
Service levelBetterLower
Expansion spaceLimitedAmple

Add up the annual costs, and include the value of service levels and expansion. Often, the closer site costs more in rent but less in total — but not always. The answer depends on trip volumes and distances.

When cheaper land wins

  • Low trip frequency — long-term storage, slow-moving stock
  • Large space needs — where closer land is unavailable at the required size
  • Regional distribution — where proximity to highways matters more than to the city
  • Future growth — where expansion space is critical

When closer land wins

  • High trip frequency — e-commerce, last-mile delivery, fresh goods
  • Tight service windows
  • Staff-intensive operations — where workforce access matters
  • Cold chain — where transit time affects product quality

Network thinking

Many logistics businesses use multiple facilities — a larger regional centre further out and smaller hubs closer to customers. The location of each depends on its role in the network. Choosing one site in isolation can miss this. See warehouse and logistics site selection.

Future changes

Road projects can change the trade-off — a new highway or ring road can bring a further site effectively closer. But planned roads can be delayed, so weigh existing infrastructure more heavily. See road access for industrial land.

Gathering the data

A fair comparison needs real operating data: current delivery volumes by destination, trip patterns by time of day, vehicle types and loads, and where staff live. Businesses moving from an existing facility have much of this already. New entrants can estimate from customer forecasts and test those estimates with logistics partners. Even rough data, applied consistently to every site, gives a far better answer than comparing land prices alone.

Common mistakes

  • Comparing land price only
  • Using distance instead of travel time
  • Ignoring the number of vehicles needed
  • Forgetting staff commuting
  • Not considering network role

Testing sensitivity

Transport costs change with fuel prices, wages, toll rates and congestion, and customer locations shift over time. Test how the comparison holds up if transport costs rise, if delivery volumes grow, or if a key customer moves. A site that wins only under today's assumptions is riskier than one that remains competitive across a range of scenarios.

How we help

Through warehousing and logistics land and industrial land services, we help companies identify sites across a search area, check records and access, and compare options on total cost rather than land price alone.

Frequently asked questions

Have a project or land in mind?

Talk to ANR Horizon Group about land, solar, wind or industrial projects — wherever you sit in the process.

Discuss a Project